Welcome To Hercules Trommels
Hercules Trommels
NEWS
HOME NEWS GALLERY CONTACT
Welcome to our News page at Hercules Trommels.
Benefits
Hercules Trommels are the solution for Quarry overburden or the clean up of blasted, ripped or as dug material and the removal of fines prior to crushing. With no pegging due to it's self cleaning action contaminated, wet, dry or dirty material can be processed. Barrel openings suitable for sizing, gabion, riprap or sea defence stone.

World Map

Dealers / Agents
Stelex are after Dealers / Agents to take on our range of Hercules Trommels. If you are interested then please contact us.

 
FULL STORY
Hercules Trommel helps land reclamation in Central America
January 2010
An HT182M Mobile Hercules Trommel has been sold and installed into Central America by a European company. The Trommel will remain in one position during its life span so was sold without its running gear.

Rock blasted and dug from the quarry face is fed to the Trommel, which is positioned before the primary crusher. Clay is removed during the screening along with 10kg, 40kg, 60kg and 200kg sizes. The clean stone is being used to build river dykes using corbels both above and below the water level. Also construction of a sea wall using rock fill and drainage sluices.

As part of the contract the machine was specified to operate in high temperature and high humidity and from a remote location. The Trommel which requires minimum maintenance and supervision was ideally suited to this.

Return to Main News


 
Bullet Stelex Construction Equipment Ltd, Unit 2 Elms Lodge Barns, Melton Road, Barrow Upon Soar, Leicestershire, LE12 8HX, England. Copyright © Hercules Trommels 2011.
Stelex Engineering Ltd