Another Hercules Trommel enters into production in France.

Stelex Engineering Limited are pleased to announce the recent installation of their latest HT182 heavy duty static trommel for a customer in the south of France. The customer is not new to Hercules Trommels and has been operating a machine in one of the groups quarries.


The new HT182 has been installed at another site and is helping to produce clean, sized products from a 900mm contaminated feed material. The recovery of more stone from the feed material is also reducing waste in the quarry. This gives added value to the customer’s existing quarry reserves for future years to come.


The HT182 is rated up to 500tph and is producing two sizes plus oversize from the feed material. The Trommel is mounted on a steel frame with access platforms on both sides for safe routine inspections. The large heavy duty feed hopper is receiving material directly from a dump truck.


All machines are built in the Stelex factory in Shropshire and many options are available to suit customer’s specific project requirements.